Tuesday, July 27
Another day at the neurospine center with papaw.
Tim's pain has increased in his lower back and legs. The MRI rebelled a hernated disk. We decided for a procedure vs surgery right now. We pray this helps.
Sunday, July 25
Another day spent on remodeling
Saturday, July 17
It's coming together slowly
We are still working on the remodel. The bathroom is coming together slowly but surely. Al and Mick came over Wed. and finished the Sheet rock mudding and sanding we had been working on for several days. They also painted and set the toilet. This got us caught up. I will post pictures as soon as we finish. Hopefully today we will finish steepling the ceiling, clean up paint spillage from floor, wire lights and outlets, connect plumbing to tub and sink (might not get this done unless Tim and I can set the granite on vanity by ourselves). I know he can if he has the right help. I don'tknow if I'm the right help :)
Monday, July 5
This is the only picture I could show of the wiring job. This the closet with most of the sheetrock hung.

Mickey and Tim worked all day Saturday on wiring July 4th weekend. I got to spend the day with the children. It was HOT outside. We went swimming. Braylen came over and swam with Jenn and Al. She didn't last very long before play time turned into nap time. It was way to noisy and dusty for a girl to catch some zzzz's so they had to go home. We met up a few hours later at Jenn and Al's house for a good old fasion cook out!!
Mickey and Tim worked all day Saturday on wiring July 4th weekend. I got to spend the day with the children. It was HOT outside. We went swimming. Braylen came over and swam with Jenn and Al. She didn't last very long before play time turned into nap time. It was way to noisy and dusty for a girl to catch some zzzz's so they had to go home. We met up a few hours later at Jenn and Al's house for a good old fasion cook out!!